Campus Thales

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2015
  • Delivery year : 2017
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 58 996 m2
  • Construction/refurbishment cost : 135 000 000 €
  • Number of Work station : 2 600 Work station


Moderated by : C21 France La redaction

Similar case studies

ADEMI-DF

​An office building, designed for ADEMI-DF's new headquarters (Association of Real Estate Market Companies of Brazil Federal District). ADEMI-DF was opened on december 2015. This project, with sustainable solutions, has 733m2 of built (...)

Kuggen. Ecopilot, energenious building automation system

​KabonaABKabona is a company which works with energenious energy building automation and the company’s head office is locatedin Borås, Sweden. Kabona was founded in 2001 and has long-standing and solidexperience, which has formed the (...)

Brock Environmental Center

The Brock Environmental Center is certified to the Living Building Challenge (LBC) and Leadership in Energy and Environmental Design (LEED) Platinum. The center is designed to be energy positive and zero water, and resilient to the (...)


  • Published on 15 June 18
    by Amandine Guillaume|France
    Viewed 3870 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice


    A contemporary, rational and technological campus


    Certification Scheme


    Location

    75-77 Avenue Marcel Dassault , 33700 Mérignac France

    Technicals Features