AUDEG (Agency of Urbanism and Development of Guyana)

  • Project type : Renovation
  • Building Type : Office building < 28m
  • Construction Year : 1985
  • Delivery year : 2018
  • Climate zone : [Aw] Tropical Wet & Dry with dry winter.
  • Net Floor Area : 467 m2
  • Construction/refurbishment cost : 360 000 €
  • Number of Work station : 16 Work station
  • Cost/m2 : 771 €/m2
  • Cost/Work station : 22 500 €/Work station


Moderated by : Hassan ABOUZID

Similar case studies

Brock Environmental Center

The Brock Environmental Center is certified to the Living Building Challenge (LBC) and Leadership in Energy and Environmental Design (LEED) Platinum. The center is designed to be energy positive and zero water, and resilient to the (...)

Green Lighthouse

​Green Lighthouse is Denmark’s first public carbon-neutral building. The building has been built in less than a year in a close public/private partnership.Green Lighthouse is an energy-efficient building of great architectural merit (...)

Kuggen. Ecopilot, energenious building automation system

​KabonaABKabona is a company which works with energenious energy building automation and the company’s head office is locatedin Borås, Sweden. Kabona was founded in 2001 and has long-standing and solidexperience, which has formed the (...)


  • Published on 10 May 19
    by Jérémy FERNANDEZ-BILBAO|France
    Viewed 549 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates
    Users' Choice


    The thermal protection has been improved thanks to the renovation of the facades and their modification (replacement of the awning of Wapa shingle by an aluminum solar breeze, displacement and protection of the air conditioners by a local wooden mesh, replacement of windows by glazing antelio, addition of a tin canopy on the gable floor to the west, addition of a vertical wooden sunshade on the entrance). In addition, insulation has been laid under the wooden floors to ensure better thermal and acoustic comfort. A ++ air conditioners have replaced older, less efficient appliances and air blowers have been installed in all offices to allow for reversibility of the premises.


    Location

    Rond point mirza , 97300 Cayenne France

    Technicals Features