Modular positive energy nursery

  • Project type : New Construction
  • Building Type : Preschool, kindergarten, nursery
  • Construction Year : 2014
  • Delivery year : 2014
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.
  • Net Floor Area : 149 m2
  • Construction/refurbishment cost : 420 000 €
  • Number of Children : 9 Children
  • Cost/m2 : 2 819 €/m2
  • Cost/Children : 46 667 €/Children


Moderated by : Hassan ABOUZID

Similar case studies

Elementary school extension -Chauconin-Neufmontiers

In october 2017, the municipality of Chauconin-Neufmontiers officially inaugurated the new premises of  "Marianne" school, an unprecedented educational extension for this town of 3000 inhabitants.The project is carried out as part (...)

ISEA Learning Center

​The learning centre was built to help children coming from under privileged families from Suceava. The ISEA Association (intervention, support, education, assistance) had the initiative of creating an after school program for these (...)

Citizen Eco-Project

The eco-citizen project cuts across different services areas to population:Catering (early childhood, school and elderly)Childcare facilities to childhood and early childhood (nursery and leisure centre for after-school activities (...)


Testimonials


Comments


  • Published on 19 July 18
    by Jean-François Daures|France
    Viewed 4776 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Temperate Climates
    Users' Choice


    Positive energy public equipment that is self-financing over a period of 15 years

    A photovoltaic over roof that protects buildings and its surroundings from solar radiation and bad weather. Vegetated facades of vines to create vertical sunshades and lower the outside temperature of the walls by 15 ° C. A scalable local wood building.


    Certification Scheme


    Location

    Rue du Cannet , 34400 Saint Sériés France

    Technicals Features