Titania Building: zero energy consumption

  • Project type : New Construction
  • Building Type : Isolated or semi-detached house
  • Construction Year : 2016
  • Delivery year : 2017
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.
  • Net Floor Area : 280 m2
  • Construction/refurbishment cost : 1 180 €
  • Number of Dwelling : 1 Dwelling
  • Cost/m2 : 4 €/m2
  • Cost/Dwelling : 1 180 €/Dwelling


Moderated by : Sylvain Bosquet

Similar case studies

ALFARO LAIF

The 5 residential housing project consist in two floor plan building oriented EAST TO WEST, located in Garcia, Nuevo Leon, Mexico in warm weather and high humidity in summer. They are the first 5 passive house that achieve the Classic (...)

Refurbishment project of an Alqueria , in order to get negligible HVAC energy demand.

​The aim of this project is the refurbishment of a traditional Valencian orchard house, whose constructive typology is called Alquería, in order to achieve a negligible HVAC energy demand The objective of this project was defined cons (...)

E4 House

The challenge of designing an E4 House, coming up with personalised ideas and design to enhance the 4 main concepts: Energy efficiency, Environment, Emotion &health, Economy.Energy efficiency refers to the minimization of energy consu (...)


  • Published on 19 April 17
    by Daniel Diedrich|España
    Viewed 9614 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2017 - Buildings

    Energy & Temperate Climates
    Users' Choice



    Certification Scheme


    Location

    , 28043 Madrid España

    Technicals Features