The Towers of Bolueta, the highest Passivhaus in the world

  • Project type : New Construction
  • Building Type : Collective housing > 50m
  • Construction Year : 2018
  • Delivery year : 2018
  • Climate zone : [CsC] Interior Mediterranean - Mild & dry summer.
  • Net Floor Area : 45 843 m2
  • Construction/refurbishment cost : 26 000 000 €
  • Number of Dwelling : 361 Dwelling


Moderated by : Sylvain Bosquet

Similar case studies

EDIFICI ACONCAGUA

​​Reformed building with 27 apartments, applying energy efficiency criteria. It’s situatedin an alpine zone.The winter’s minimum temperature is -12°C.Reduced heating consumption by 82%.Acting on facade insulation and heating system (...)

LILAC: Low Impact Living Affordable Community

LILAC is the UK's first affordable, ecological cohousing project. A community of 20 households and common house, the buildings are made with the ModCell prefabricated straw bale construction system, assembled by LILAC members using (...)

The Link 345 Ciputra

Developed by Ciputra Westlake City Development Co. Ltd., The Link 345 Ciputra consists of three modern, 21-story residential complexes of nearly 600 two and three-bedroom units located in Hanoi. The residential towers offer a balanced (...)


  • Published on 28 May 18
    by Germán Velázquez Arizmendi|España
    Viewed 7538 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Low Carbon
    Users' Choice


    Being the highest certified Passivhaus building in the world, it implies a huge improvement in energy efficiency. On a building that complies with current regulations, and with an Energy Rating A, the reduction in heating demand will be of 80%!

    There are several issues to highlight in this project, which make it an example of global sustainability:

    -Construction traditional: It is a really remarkable aspect, the building has been built with construction techniques and conventional materials such as concrete for the structure, brick, plaster, etc. It was a premise to be able to use the same materials that are commonly used by the administration.

    -Passivhaus XXL: Its scale has meant that many constructive issues have had to be reconsidered, in order to make it viable in a building of this size. There have been times when there were more than 125 people working simultaneously in the work, it has been vital to have a great organization by the construction company, Sukia, and the Facultative Directorate, #VArquitectos.

    -Social housing: There is no typology in which it makes more sense to improve construction in order to achieve the category of passive building or almost zero consumption. In this way, energy poverty situations will be avoided, maintaining maximum interior comfort, and minimizing after sales maintenance.

    -Low cost: The budget is within the parameters established by the Basque Government for VPO construction cost. It has been necessary a deep study of all the solutions and materials to obtain the maximum benefits, maintaining the best durability without an extra cost.

    Conclusion: if it has been possible in this case and with these premises, we have the certainty that any project developed correctly can meet the necessary requirements to be considered passive or almost zero consumption.