Restoration of San Cristobal House

  • Project type : Renovation
  • Building Type : Collective housing > 50m
  • Construction Year : 2012
  • Delivery year : 0
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.
  • Net Floor Area : 546 m2
  • Construction/refurbishment cost : 604 603 €
  • Number of Dwelling : 6 Dwelling
  • Cost/m2 : 1 107 €/m2
  • Cost/Dwelling : 100 767 €/Dwelling


Moderated by : Isabel Sala

Similar case studies

The Link 345 Ciputra

Developed by Ciputra Westlake City Development Co. Ltd., The Link 345 Ciputra consists of three modern, 21-story residential complexes of nearly 600 two and three-bedroom units located in Hanoi. The residential towers offer a balanced (...)

Forest in the Sky

Developed by Flamingo Dai Lai Joint Stock Company, Forest in the Sky is a unique real estate project with advanced green technologies located in Hanoi. Vietnam’s Coteccons served as the construction contractor for the eco-friendly (...)

HSB Living Lab

The HSB Living Lab (Gothenburg, Sweden) is a habitation infrastructure, in the form of student housing, that aims to be a co-creative social space for experimenting with sustainable technology and lifestyle in order to develop innovat (...)


  • Published on 18 January 13
    by Maixi Maruri San Vicente|España
    Viewed 6422 times


  • Certification Scheme


    Location

    El Baular, nº 14 , 48860 Zalla España

    Technicals Features