ENERGY REHABILITATION AND BUILDING ACCESSIBILITY IN ZARAMAGA, VITORIA-GASTEIZ

  • Project type : Renovation
  • Building Type : Collective housing > 50m
  • Construction Year : 2014
  • Delivery year : 2015
  • Climate zone : [Dfb] Humid Continental Mild Summer, Wet All Year
  • Net Floor Area : 1 833 m2
  • Construction/refurbishment cost : 1 058 056 €
  • Number of Dwelling : 30 Dwelling
  • Cost/m2 : 577 €/m2
  • Cost/Dwelling : 35 269 €/Dwelling


Moderated by : Sylvain Bosquet

Similar case studies

The Link 345 Ciputra

Developed by Ciputra Westlake City Development Co. Ltd., The Link 345 Ciputra consists of three modern, 21-story residential complexes of nearly 600 two and three-bedroom units located in Hanoi. The residential towers offer a balanced (...)

Ecolife Capitol

Ecolife Capitol’s three high-rise residential towers introduced over 630 green apartments to the housing market in Ha Noi, Vietnam. To maximize energy savings and ensure occupant comfort, each of the apartments in the development are (...)

Palm tree residential area

​Project: Palm Tree Residential Area, Ecopark, Hung YenBuilding investor: Viet Hung Company (VIHAJICO)Architecture designer: Kume SekkeiTotal land area: 40,100m2Ecopark blocks were designed in accordance with the functional city model (...)


  • Published on 07 July 16
    by Ramón Ruiz-Cuevas Peña|España
    Viewed 12516 times


  • Contest

    Green Building Solutions Awards 2016

    Energy & Temperate Climates
    Sustainable Renovation Grand Prize
    Users' Choice Award



    Certification Scheme


    Location

    , 01013 VITORIA-GASTEIZ España

    Technicals Features