SOLEO

  • Project type : Extension + refurbishment
  • Building Type : Office building < 28m
  • Construction Year : 2013
  • Delivery year : 2017
  • Climate zone : [Cbc] Mild, dry winter, warm and wet summer.
  • Net Floor Area : 17 831 m2
  • Construction/refurbishment cost : 26 500 000 €
  • Number of Work station : 570 Work station
  • Cost/m2 : 1 486 €/m2
  • Cost/Work station : 46 491 €/Work station


Moderated by : Michel Heukmes

Similar case studies

CLT multicomfort office building

In March 2014, Tecto Arhitectura was appointed to design the new office building for HSR factory in Reci, Covasna, as the first large scale project with CLT structure in south-east Europe. The main challenge was to create an office (...)

Administration of nature and forests

A sustainable, environmentally friendly planning concept played a crucial role in this new build for the Luxembourg Nature and Forestry Agency. This energy-plus building, which can produce more energy than it consumes, is one of the (...)

My Republic Plaza (Green Office Park 6)

​My Republic Plaza (Green Office Park6) is located in foot print area amounted 12,890 m2 has five floors for work space and basement. It also becomes one of part in Green Office Park BSD City which built base on Green Building Concept (...)


  • Published on 20 June 19
    by Benoit Choquet|Belgique
    Viewed 546 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Temperate Climates
    Health & Comfort
    Users' Choice


    In addition to the design office responsible for architectural studies, our stability teams, special techniques, safety & health coordination, delegated project management and supervision, as well as the PEB manager, were mobilized. for the different phases related to the design and implementation of the building on behalf of IGRETEC and ETHIAS, co-owner of the building.

    At the same time, all of our staff were involved in the different phases for the development of the working areas occupied by IGRETEC.

    Finally, it was our Property Management Department that managed the move from the Mainz wing to the Poirier wing for our services.