Project F.

  • Project type : New Construction
  • Building Type : Isolated or semi-detached house
  • Construction Year : 2016
  • Delivery year : 2017
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 96 m2
  • Construction/refurbishment cost : 136 000 €
  • Number of Dwelling : 1 Dwelling
  • Cost/m2 : 0 €/m2
  • Cost/Dwelling : 100 €/Dwelling


Moderated by : C21 France La redaction

Similar case studies

Lark Rise Passivhaus Plus house

Lark Rise, the first Passivhaus Plus building in the UK, was rigurously designed and built by Bere Architecs in 2015 to test the viability of the concept ‘house as power station’ in a north European climate and to establish the potent (...)

The Taft School Faculty Home

This home is an excellent example of design and construction for temperate climates and energy conservation. The Taft School faculty home serves as a high performance residence and learning lab for students. In US climate zone 5, it (...)

Refurbishment project of an Alqueria , in order to get negligible HVAC energy demand.

​The aim of this project is the refurbishment of a traditional Valencian orchard house, whose constructive typology is called Alquería, in order to achieve a negligible HVAC energy demand The objective of this project was defined cons (...)


  • Published on 16 May 18
    by Olivier Davids|Belgique
    Viewed 1466 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice


    The project is designed on the passive standard. The contemporary intention is frank and simple. To optimize the compactness of the project, a car-port with a green roof is laid out in front. It is part of a dense urban fabric, well served by services, local shops and transport offer. The use of sustainable materials was emphasized : laminated timber structure, use of durable insulation (cellulose wadding, cork, fibreboard), cellulose floor and lining plates, lack of wall finishing and interior ceilings (spruce wood left exposed), untreated wood flooring, use of environmentally friendly paints, FPO roofing deck membrane. Simplification of the technical installations : absence of heating system except the presence of a heating battery on the MVC, complete home automation. Installation of photovoltaic electricity production of 3.75 kWp, covering the totality of the annual energy needs for the heating (1.371 kWh / year), domestic hot water production (1,457 kWh / year) as well as a portion of domestic electricity consumption; the project can thus be described as energetically positive in the annual balance sheet (excluding domestic electricity consumption). Gross building data: Annual heating requirement according to PHPP: 14 kWh / m²a (15 kWh / m²a max.) Annual requirement in primary energy according to PHPP: 75.8 kWh / m²a (120 kWh / m²a max.) Frequency of overheating according to PHPP: 5.3% (10% max). Results of the airtightness test before finalization: n50: 0,19 1 / h (0,6 1 / h max.) According to EN 13829, method A Results of the final air tightness test: 0 , 3 1 / h (max. 0.6 l / h) according to EN 13829, method A


    Certification Scheme


    Location

    , 4041 Vottem Belgique

    Technicals Features