Project F.

  • Project type : New Construction
  • Building Type : Isolated or semi-detached house
  • Construction Year : 2016
  • Delivery year : 2017
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 96 m2
  • Construction/refurbishment cost : 136 000 €
  • Number of Dwelling : 1 Dwelling
  • Cost/m2 : 0 €/m2
  • Cost/Dwelling : 100 €/Dwelling


Moderated by : C21 France La redaction

Similar case studies

Butterfly House

This is an energy efficient house that was built by the University of Ubonratchathani in 2005 as part of a research project funded by the Ministry of Energy of Thailand. 2-storey house with 2 bedrooms on the second floor and living (...)

Steel Farm

​Steel Farm is located near Hexham in the North Pennine Area of Outstanding Natural Beauty (ANOB). Built using traditional construction technology it is the first Certified Passivhaus in Northumberland. As organic farmers they owned (...)

EFdeN 4C

​We are over 30 young and passionate students, from fields ranging from architecture, engineering, communication or management, and together we form the EFdeN team.In 2014 we represented Romania in the final for Solar Decathlon Europe (...)


  • Published on 16 May 18
    by Olivier Davids|Belgique
    Viewed 1821 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice


    The project is designed on the passive standard. The contemporary intention is frank and simple. To optimize the compactness of the project, a car-port with a green roof is laid out in front. It is part of a dense urban fabric, well served by services, local shops and transport offer. The use of sustainable materials was emphasized : laminated timber structure, use of durable insulation (cellulose wadding, cork, fibreboard), cellulose floor and lining plates, lack of wall finishing and interior ceilings (spruce wood left exposed), untreated wood flooring, use of environmentally friendly paints, FPO roofing deck membrane. Simplification of the technical installations : absence of heating system except the presence of a heating battery on the MVC, complete home automation. Installation of photovoltaic electricity production of 3.75 kWp, covering the totality of the annual energy needs for the heating (1.371 kWh / year), domestic hot water production (1,457 kWh / year) as well as a portion of domestic electricity consumption; the project can thus be described as energetically positive in the annual balance sheet (excluding domestic electricity consumption). Gross building data: Annual heating requirement according to PHPP: 14 kWh / m²a (15 kWh / m²a max.) Annual requirement in primary energy according to PHPP: 75.8 kWh / m²a (120 kWh / m²a max.) Frequency of overheating according to PHPP: 5.3% (10% max). Results of the airtightness test before finalization: n50: 0,19 1 / h (0,6 1 / h max.) According to EN 13829, method A Results of the final air tightness test: 0 , 3 1 / h (max. 0.6 l / h) according to EN 13829, method A


    Certification Scheme


    Location

    , 4041 Vottem Belgique

    Technicals Features