Project 103

3121
Last modified by the author on 03/02/2021 - 20:55
  • Building Type : Isolated or semi-detached house
  • Construction Year :
  • Delivery year : 2018
  • Address 1 - street : rue des Américains 103 7022 HYON, Belgique
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 293 m2
  • Construction/refurbishment cost : 178 000 €
  • Number of Dwelling : 1 Dwelling
  • Cost/m2 : 607.51 €/m2
  • Primary energy need
    44 kWhep/m2.an
    (Calculation method : )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

"Projet 103" consists of the renovation of an old and unhealthy house. The objective was to reach the "Q-ZEN" energy standard (2021 standard in the Walloon Region, Belgium) at the end of the renovation while doing without fossil fuels: only a wood stove provides heating for the house.

The programme includes insulation of the envelope (with, in particular, bio-sourced insulation for the roof: Gramitherm), careful airtightness, double flow ventilation and photovoltaic panels. 

The label of the house is A+, which is better than what is required for a new house in 2021. 

Data reliability

3rd part certified

Photo credit

Elie Delvigne
Cecile Hoyos
Denis vasilov

Contractor

Construction Manager

Stakeholders

Owner approach of sustainability

The aim was to carry out a renovation (environmental impact of a renovation vs. new construction) of a house in an urban context (proximity to services, public transport, etc.).


The objective of the renovation was to show that it is possible to achieve high energy performance (A+ label) without the use of fossil fuels (only a wood-burning stove heats the house) and by using bio-based materials (gramitherm insulation on the roof).

The consumption of the house is currently 0 € (wood recovered from neighbours, electricity compensated by photovoltaic panels).

In terms of biodiversity, a permaculture vegetable garden, a greenhouse and a henhouse have been installed. 

Architectural description

Work on the building envelope:

- external insulation of walls ;

- insulation of the attic floor;

- triple glazed aluminium joinery;

- insulation of the floor slab and the cellar ceiling; 

- work on the airtightness. 

Systems: 

- Heating by wood stove (independence from fossil fuels); 

- Domestic hot water by electric boiler (simplicity of installation); 

- double flow ventilation system with heat recovery; 

- photovoltaic panels to compensate for electricity consumption. 

Energy consumption

  • 44,00 kWhep/m2.an
  • 510,00 kWhep/m2.an
  • 40,00 kWhef/m2.an
  • According to the PEB certification method: 79% heating, 15% DHW, 6% auxiliaries

    Consumption = 0. Wood recovered when cutting trees, electricity consumed offset by photovoltaics

  • 658,00 kWhep/m2.an

Envelope performance

  • 0,33 W.m-2.K-1
  • Roof insulation with Gramitherm insulation, facades insulated from the outside with plaster on EPS insulation, floor slab insulated with icynene foam. Triple glazed aluminium joinery.

  • 0,62
  • n50

  • 5,00
  •  Test blower door

Systems

    • Wood boiler
    • Individual electric boiler
    • No cooling system
    • Double flow heat exchanger
    • Solar photovoltaic
    • Wood boiler
  • 100,00 %
  • Solar photovoltaic system installation composed of 20 panels of 270 Wc

Urban environment

    Existing house on the outskirts of an urban centre (city of Mons). 

    A bus line passes in front of the building (bus stop a few dozen metres away).

    A cycle track is in front of the building (see photo). 

    A permaculture vegetable garden has been set up in the garden with a chicken coop and a greenhouse. 

Product


    Double flow ventilation

    Zehnder

     https://www.zehnder.be/

    HVAC, électricité / ventilation, cooling

    Double flow ventilation

    Improved air quality, night cooling in summer


    Wood stove

    STUV

     https://www.stuv.com/fr

    HVAC, électricité / heating, hot water

    Wood stove

    Wood stove "heat", independence from renewable energy


    Photovoltaic installation

    JA Solar

     https://www.jasolar.com

    Management / Others

    20 solar panels of 270 Wp

    Electricity bill at 0


    Solvent-free paint

    Peintagone

    [email protected]

     https://www.peintagone.be/

    Finishing work / paints, mural, wallcoverings

    Velvety matt acrylic paint, almost solvent-free and plasticizer-free, very washable.

    Solvent-free paint used throughout the house to minimise the air quality impact of finishes

Construction and exploitation costs

  • 1 500,00
  • 6 900,00
  • 190 000
  • 30 000
  • The renovation cost 600 € / m² HVAC

Water management

  • 30,00 m3
  • 40,00 m3
  • 10,000-litre rainwater tank which supplies the toilets, the washing machine and the outdoor taps used for the vegetable garden

Indoor Air quality

    The double flow ventilation ensures a constant and continuous ventilation of the building. 

    Solvent-free paint was used to paint the walls (Belgian brand PEINTAGONE). 

GHG emissions

  • 1,00 KgCO2/m2/an
  • Certification PEB

  • 120,00 KgCO2 /m2
  • 50,00 an(s)

Reasons for participating in the competition(s)

L'objectif premier du projet est de montrer aux particuliers et professionnels qu'il est possible d'atteindre une haute performance énergétique en rénovation. Le bâtiment est labellisé A+ (meilleur que le niveau d'exigence des nouvelles constructions en 2021).

Le second objectif est de montrer que le premier est atteignable en utilisant des matériaux biosourcés produit localement (Gramitherm, isolant à base d'herbe de prairie, produit à Auvelais en Belgique). 

Enfin, le troisième objectif visé et atteint est de se passer des énergies fossiles afin de réduire au maximum l'empreinte carbone du bâtiment.  

Building candidate in the category

Energy & Temperate Climates

Energy & Temperate Climates

Green Solutions Awards 2020-2021
PDF
 q-zen renovation bio-based peb gramitherm

Share :
Author of the page

Elie Delvigne

Gérant