Liverpool

New Construction

  • Building Type : Collective housing > 50m
  • Construction Year : 2014
  • Delivery year : 2015
  • Address 1 - street : 1080 MOLENBECK, Belgique
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 2 000 m2
  • Construction/refurbishment cost : 4 500 000 €
  • Cost/m2 : 2250 €/m2

Proposed by :

Certifications :

  • Primary energy need :
    39 kWhep/m2.an
    (Calculation method : Other )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

See more details about this project

 http://www.architectura.be/fr/newsdetail.asp?id_tekst=10872

Data reliability

3rd part certified

Stakeholders

    Contractor

    Beliris


    Designer

    B612 Associates


    Thermal consultancy agency

    MK Engineering

    Piotr Wierusz-Kowalski

Contracting method

Other methods

Energy consumption

  • 39 kWhep/m2.an
  • 100 kWhep/m2.an
  • Other

  • 120 kWhef/m2.an

Envelope performance

  • 1 W.m-2.K-1
  • n50

  • 1

Systems

    • Condensing gas boiler
    • Combined Heat and Power
    • Water radiator
    • Fan coil
    • Condensing gas boiler
    • Other hot water system
    • No cooling system
    • Double flow
    • Solar photovoltaic

Product

    Plateforme maison passive

    Equipe PMP

    Management / Contracting

Construction and exploitation costs

  • 130 000
  • 4 500 000

Land plot area

1 000 m2

Built-up area

100 %

Green space

300

Building Environmental Quality

  • energy efficiency
  • renewable energies
​Passivhaus

Contest

Green Building Solutions Awards 2015



Author of the page

  • Rodolphe Deborre

    Directeur Innovation et Développement Durable


  • Other case studies

    More

    Contest

    Green Building Solutions Awards 2015