Extension of the DON BOSCO Institute to Wolluwe Saint Pierre

  • Project type : New Construction
  • Building Type : School, college, university
  • Construction Year : 2017
  • Delivery year : 2018
  • Climate zone : [Cwb] Mild, dry winter, cool and wet summer.
  • Net Floor Area : 3 821 m2
  • Construction/refurbishment cost : 6 703 720 €
  • Number of Pupil : 684 Pupil
  • Cost/m2 : 1 754 €/m2
  • Cost/Pupil : 9 801 €/Pupil


Moderated by : Clément Gaillard

Similar case studies

Waste House

​The Brighton Waste House is the first permanent ‘carbon negative’ public building in Europe to be constructed from approximately 90% waste, surplus material & discarded plastic gathered from the construction and other industries, (...)

Universidad del Medio Ambiente

Ten years ago, a group of young Mexican professionals founded a university to address the environmental challenges that they saw in Latin America. Today, the Universidad del Medio Ambiente (UMA) offers master’s degrees, workshops, (...)

ACLEDA Institute of Business

For years, ACLEDA Bank recruited the largest number of college graduates in Cambodia. As the demand for skilled professionals began to outpace the supply of graduates, ACLEDA Bank decided to build their own business school to address (...)


  • Published on 24 June 19
    by Geoffrey Vermeulen|Belgique
    Viewed 699 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Temperate Climates
    Health & Comfort
    Users' Choice


    PASSIVE BUILDING

    - the heating requirement is maximum 15 kWh / (m².year)

    - the cooling requirement is maximum 15 kWh / (m².year)

    - the overheating frequency of the building above 25 ° C is maximum 5% of the occupancy time of the building (comfort criterion verified by dynamic thermal simulation)

    - The air tightness of the building ensures a leak rate through the envelope of maximum 0.6 air changes per hour at 50 Pa (criterion verified according to report)

    - the primary energy consumption is less than or equal to 90 - 2.5 x compactness (expressed in primary KwH / (m².year)


    Certification Scheme


    Location

    avenue du val d'or, 90 , 1150 Wolluwe Saint Pierre Belgique

    Technicals Features