- The target energy performance for the project is the passive standard at a minimum, with the aim of reaching a zero-energy performance. The energy approach is the energetica trias :
1. use fossil fuels effectively
2. use renewable sources
3. reduce the energy demand
- Sustainable approach integrated into the project: materials, water management, integration into the environment, comfort, ...
- The intention is to maximize a renewal of biotopes in exploitable areas (currently presence of vegetable gardens on the site):
1. presence of extensive green flat roofs (374m²)
2. the maintenance of a maximum of gardens in the ground (426m²)
3. the preservation of mineral zones in permeable zones (103m²)
- In terms of reproducibility , the project is technically applicable to other similar buildings (office buildings or administrative buildings) in the Brussels context given the destination of the building.
- The cost is based on a quantification of capital gains and losses related to the technical choices specifically made in the project (passive envelope, adiabatic cooling, low-energy lighting ...) compared to a building designed to simply respect the PEB regulations currently in force.