CENTER PEREX
- by Fourny Laura
- /
- 2019-06-19 09:07:03
- /
- Belgique
- /
- 2832 / FR
Extension + refurbishment
- Building Type : Office building < 28m
- Construction Year : 2019
- Delivery year : 2019
- Address 1 - street : Rue Del'Grète 22 5020 NAMUR, Belgique
- Climate zone : [Cbc] Mild, dry winter, warm and wet summer.
- Net Floor Area : 7 884 m2
- Construction/refurbishment cost : 9 509 725 €
- Cost/m2 : 1206.21 €/m2
-
Primary energy need :
26 kWhep/m2.an
(Calculation method : RT 2012 )
Transformation and extension of the PEREX center in Daussoulx, the center of permanence and control of the motorways and waterways of Wallonia.
This building is passive and NZEB. Alongside the choices related to the energy performance of the project, the design of this sustainable building also incorporates a set of design choices, reducing its overall environmental impact :
o Choice of building materials
o Water management
o Optimization of thermal comfort and well-being
Data reliability
Self-declared
Photo credit
Serge Brison
Contractor
Construction Manager
Stakeholders
Designer
Association momentanée : Atelier de l'Arbre d'Or - Altiplan Cedric PONCELET - GSM : 0497/75.89.45 - MAIL : c.poncelet@arbredor.be ArchitectureOther consultancy agency
Bureau Greisch Bruno BUSCH - GSM : 0477/43.63.01 - MAIL : bbusch@greisch.com Stability / Special Techniques / Energy / Sustainable Development / Health Safety CoordinationCompany
IMTECH Belgium Patrice TORDEUR - GSM : 0486/49.11.61 - MAIL : patrice.tordeur@imtech.be Special technical subcontractors (HVAC & Electricity) and maintenanceContracting method
Public Private Partnership
Architectural description
Intentions, starting point of the urban and architectural project:
o The main objective is to create a specific place at the Perex 4.0 center, in with Perex 1.0, in order to create a coherent whole, through a qualitative landscape and urban planning approach .
o The implementation of the new administrative building is defined in such a way as to make it visible and accessible from the public space, while taking full advantage of the potential of the site, in order to reinforce the existing landscape qualities and to respect the qualities of the related building. The main lines of force of the main roads and highways that make up the site are taken into account as part of this reflection.
o The various constraints related to the geographical location of the place, the specific program, the orientation, the visual perspectives or the goal of high environmental quality, are all opportunities to optimize the project and improve the immediate environment.
o The singularity of the program, located at the motorway junction of Wallonia, at the gates of its capital.
o The building is designed taking into account exterior traffic , accessibility and external mobility.
o Environmental and sustainability specifications are integrated at every stage of the design, from the definition of building orientation to details of construction, choice of materials, facilities and technical equipment.
Systems
- Boiler fuel
- Heat pump
- Solar cooling
- Floor cooling
- Free-cooling
- Double flow heat exchanger
- Solar photovoltaic
Smart Building
Product
-
Active floor

HVAC, électricité / ventilation, cooling
Optimal use of renewable energy sources
Complies with building sustainability certifications such as LEED, BREEAM and DGNB
Components largely maintenance free
Contribution to true sustainability.
Technique directly integrated into the building design.
Urban environment
Homogeneity: by the perfect coherence of tones (white / gray), the play of simplified volumetrics and the assertion of the tower as connecting element, the fusion is perfect.
This perception is reinforced by the complete covering of the perex 1. 0 of a coating on insulation and its existing zinc cover.
The new center comes to take support on the ground, taking advantage of the differences of level to integrate the ground garden in a base.
On this base, the project comes to take support. The different slides between them to make the most of the resources they need.
Central place : motorway crossroads of Wallonia, the site has an important symbolism in the notion of control. We wanted to highlight this symbiosis between the site and the program.
Signal: The new control center proudly displays its central status.
Parking: We favored concentration rather than spreading, in order to optimize the landscape integration and the quality of the distributions.
1. A new 50-space car park (of which 36 reserved for the police) is created on the left of the project,
2. the current car park (in ground garden) and along the road is repacked in 55 locations.
3. The existing 15-seater pocket, located before the site, is maintained.
A total of 120 places (including 3 PRMs, in the immediate vicinity of the entrance).
Parking spaces
120 parking spaces
A caractère durable, les choix de conception innovante de ce bâtiment ont été pensés pour réduire l’impact sur l’environnemental
global afin d’obtenir un bâtiment passif et au-delà des normes NZEB.
Ce projet résolument contemporain offre une architecture identifiante tout en répondant à des normes environnementales et énergétiques très exigeantes. Il bénéficiera aussi d’un mode d’exposition au soleil optimale grâce à l’agencement intelligent des niveaux. Les performances élevées font la part belle aux nouvelles technologies.
Enfin, l’architecture se voudra simple et épurée pour laisser libre cours à la conception et à l’agencement des espaces, tout en garantissant une grande flexibilité d’aménagement des plateaux.
Contest categories

Energy & Temperate Climates

Users' Choice
Author of the page
Other case studies

TherapieStützpunkt
- 07/04/2021
- /
- Sabrina Gassner
- /
- 390

House Solaris 416
- 02/04/2021
- /
- Michaela Fink
- /
- 284

Charter Telecom headquarters
- 02/04/2021
- /
- Construction21 Communication
- /
- 610

Kindertagesstätte Calarasi
- 02/04/2021
- /
- Construction21 Communication
- /
- 444

Zetland Passive House
- 01/04/2021
- /
- Tiffany Chong
- /
- 621

Two innovative, near zero carbon houses
- 01/04/2021
- /
- Brad Kelly
- /
- 405