My Republic Plaza (Green Office Park 6)
New Construction
- Building Type : Office building < 28m
- Construction Year : 2014
- Delivery year : 2015
- Address 1 - street : Jl. Grand Boulevard, BSD Green Office Park, BSD City 15345 TANGERANG, Indonesia
- Climate zone : [Af] Tropical Wet. No dry season.
- Net Floor Area : 15 832 m2
- Construction/refurbishment cost : 14 673 193 €
- Number of Work station : 5 Work station
- Cost/m2 : 926.81 €/m2
Certifications :
-
Primary energy need
140 kWhpe/m2.year
(Calculation method : )
See more details about this project
http://www.sinarmasland.com/site/discover-properties/commercial-industrial/bsd-green-office-parkStakeholders
Construction company
PT. Total Bangun Persada Tbk
http://www.totalbp.com/index/enContracting method
Other methods
If you had to do it again?
all system are going well as planed. further more it increases efficiency in operational building cost.
Building users opinion
building more healthy and comfort, increase productivity for occupant
Energy consumption
- 140,00 kWhpe/m2.year
- 250,00 kWhpe/m2.year
Envelope performance
- 2,40
Real final energy consumption
117,00 kWhfe/m2.year
117,00 kWhfe/m2.year
2 016
Systems
- No heating system
- Other hot water system
- Fan coil
- VAV Syst. (Variable Air Volume system)
- Natural ventilation
- Solar photovoltaic
Smart Building
Urban environment
- 13 000,00 m2
- 60,00 %
- 7 064,00
Product
ACP (aluminum composite panel)
ACPINDO
Bpk. Roganda Hp / WA : 081294466666 email : [email protected]
http://www.acpindo.com/p/reynobond.htmlGros œuvre / Structure, maçonnerie, façade
light brick ACP (aluminum composite panel) and gypsum for inside layers The glass uses 8mm T-Sunlux T-CS 140 #2 + 12mm AS + 6mm Panasap Dark Blue (Bluish Grey). Panasap Dark Blue (Bluish Grey).
less man power install to building
Glass
Asahimas
Yudi +62896 8530 6999
http://asahimas.arwuda.com/id/Gros œuvre / Structure, maçonnerie, façade
glass uses 8mm T-Sunlux T-CS 140 #2 + 12mm AS + 6mm Panasap Dark Blue (Bluish Grey). Panasap Dark Blue (Bluish Grey).
so much choice for glass
Construction and exploitation costs
- 14 673 193 €
Energy bill
- 16 900,00 €
Life Cycle Analysis
Water management
- 7 800,00 m3
- 2 335,00 m3
- 313,00 m3
Indoor Air quality
Comfort
GHG emissions
- 103,00 KgCO2/m2/year
- 25,00 year(s)