KTR Headquarters (France): Sustainable Renovation Grand Prize Winner - Green Solutions Awards 2018

KTR, a German industrial group specialized in mechanical transmissions, wanted a building reflecting the image and the values of the company for its French headquarters: innovative and offering excellent work conditions for its employees, autonomous especially energy wise. The KTR group has already built very efficient buildings, but for the site of Dardilly, the refurbishment option was chosen. The construction manager oriented the project to aim for even more ambitious goals, with a more comprehensive eco-responsibility involving all employees.

As a result:

  • The first positive energy renovation of a tertiary building, including all uses, with thermal energy and electricity storage;
  • A reduced carbon footprint by using bio-based (hemp and cork) and recycled materials, but also by teaching the importance of life cycle analysis to the construction workers and artisans on the building site;
  • Solar photovoltaic energy production allowing the building to absorb more CO2 than its own emissions (consumptions in all uses, regulatory and office automation);
  • Working comfort is very appreciated as a result of an ergonomics study, the implementation of internal mobility for desks, controlled indoor air quality and the creation of recreation spaces (gym, break room, gardens).

Dardilly, France
Office Building

Contractor: KTR France
Building engineering and interior designer: Ressources Green Building
Construction manager: Diagonale Concept
Consultancy agency: Amstein & Walthert
Company: Terre et Lac
Manufacturers: Dualsun, Biofib, Mapei, Sonepar

 

Case study Eco-Renovation headquarters of KTR France
Interested in this exemplary building?
Browse the case study linked with this video.

Moderated by : Sylvain Bosquet

Other news in "Videos & Audios"

Case: the highest wooden tower is built in Norway

Published 18 Feb 2019 - 10:00

81 meters and 18 floors, 350 meters and 70 floors, inflation is the side of wooden skyscrapers. With 81 meters of which 18 already built, the tower Mjøstårnet should retain some time the title of the tallest wooden building in the (...)

[Video] Conclusion of the Green Solutions Awards 2018 winners' gala

Published 11 Jan 2019 - 10:00

Watch the conclusion of the #GreenSolutions Awards 2018 Winners' Gala, held in Katowice during COP24, on December 6th at the University of Silesia. Nine winners - buildings, districts and infrastructures - and fourteen mentions were (...)

[Video] Award of the Green Solutions Awards 2018 Sustainable Construction Grand Prize

Published 11 Jan 2019 - 09:00

Watch the Award of the Sustainable Construction Grand Prize at the #GreenSolutions Awards 2018 Winners' Gala, held in Katowice during COP24, on December 6th at the University of Silesia. Nine winners - buildings, districts and infrast (...)


Comments





Search through the news

Enter your own key word



Other news



Categories


Most read articles