Liverpool
Last modified by the author on 18/06/2015 - 18:08
New Construction
- Building Type : Collective housing > 50m
- Construction Year : 2014
- Delivery year : 2015
- Address 1 - street : 1080 MOLENBECK, Belgique
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 2 000 m2
- Construction/refurbishment cost : 4 500 000 €
- Number of Dwelling : 16 Dwelling
- Cost/m2 : 2250 €/m2
-
Primary energy need
39 kWhep/m2.an
(Calculation method : Other )
See more details about this project
http://www.architectura.be/fr/newsdetail.asp?id_tekst=10872Data reliability
3rd part certified
Stakeholders
Contractor
Beliris
http://www.beliris.be/Designer
B612 Associates
http://www.b612associates.com/Thermal consultancy agency
MK Engineering
Piotr Wierusz-Kowalski
http://www.mkengineering.be/Contracting method
Other methods
Energy consumption
- 39,00 kWhep/m2.an
- 100,00 kWhep/m2.an
- 120,00 kWhef/m2.an
Envelope performance
- 1,00 W.m-2.K-1
- 0,50
Systems
- Condensing gas boiler
- Combined Heat and Power
- Water radiator
- Fan coil
- Condensing gas boiler
- Other hot water system
- No cooling system
- Double flow
- Solar photovoltaic
Urban environment
- 1 000,00 m2
- 100,00 %
- 300,00
Product
Plateforme maison passive
Equipe PMP
http://www.maisonpassive.be/index.phpTable 'c21_italy.innov_category' doesn't exist SELECT one.innov_category AS current,two.innov_category AS parentFROM innov_category AS oneINNER JOIN innov_category AS two ON one.parent_id = two.idWHERE one.state=1AND one.id = '28'
Construction and exploitation costs
- 130 000,00 €
- 4 500 000 €