INES Chambery
Last modified by the author on 29/01/2014 - 09:38
New Construction
- Building Type : Other building
- Construction Year : 2013
- Delivery year : 2013
- Address 1 - street : Avenue du Lac Léman, Bourget du Lac 73 CHAMBéRY, France
- Climate zone : [ET] Tundra - Polar tundra, no true summer.
- Net Floor Area : 8 696 m2
- Construction/refurbishment cost : 14 195 983 €
- Number of none : 122 none
- Cost/m2 : 1632.47 €/m2
Certifications :
-
Primary energy need
252.1 kWhep/m2.an
(Calculation method : RT 2005 )
Construction of a commercial building comprising administering INES (National Institute of Solar Energy), research laboratories and a training area.
Sustainable development approach of the project owner
The building will be a demonstrator in terms of integration of solar thermal and photovoltaic energies and renewable energies. These energy concepts will be the same component logic construction.Le new building should be a copy of a simple realization consumes little fossil energy and the best use of renewable energies, including solar energies. The design and realization of the new building will be taking into account the concerns and the following requirements: a realize a high building energy performance, ensure the sustainability deaths performance over time, maintain a good acoustic comfort, predict an integrated management of flows water, taking into account the waste management. This includes making Reflected orientation of body buildings and facades, both vis-a-vis the sun as prevailing winds, a careful choice of materials, developed an optimum ratio of facades and roof surfaces constructed with respect to a reflection on the thermal inertia of the building, the quality of thermal insulation, the tightness of the building.Architectural description
Our building is designed both as a prototype and a manifesto. Its simple but rigorous spatial organization demonstrated the technical feasibility and architectural a gait founded on the principles of sustainable development: versatility and flexibility of use, efficiency energetics, reduction of environmental impacts, quality of space and comfort for users, etc.. This citizen approach to architectural design says here its relevance, new type of dialogue with the public space and landscape, its new symbolic.The competition from 2007 and design research in 2008, the building is very ahead of its time.Building users opinion
Occupants have just emmenager (delivery in 2013).
See more details about this project
http://frnicolas.com/projets.aspx?type=tertiaire, industrie&id=60Stakeholders
Contractor
Conseil général de Savoie
http://www.cg73.fr/Designer
Atelier Michel Rémon
Michel REMON
http://www.remon.fr/Designer
Agence d'Architecture Frédéric Nicolas
Frédéric NICOLAS
http://www.frnicolas.com/Thermal consultancy agency
TECHNIP TPS
Immeuble le Quadrille, 30 rue E. Nieuport 69008 LYON
http://www.techniptps.com/Other consultancy agency
SOLENER
TULLIE Charles, 48 rue Gustave Nadaud 59000 Lille
http://www.solener.frOther consultancy agency
Denis SAVOIE (Palais de la découverte) pour cadran solaire
Other consultancy agency
TECSOL SA
Marie-Lyne Laquerrière
http://www.tecsol.frType of market
Global performance contract
Energy consumption
- 252,10 kWhep/m2.an
- 722,18 kWhep/m2.an
Real final energy consumption
204,06 kWhef/m2.an
Envelope performance
- 0,74 W.m-2.K-1
- 0,46
- 1,14
More information
Book building in 2013, recently invested by the occupants
Systems
- Water radiator
- Fan coil
- Wood boiler
- Solar thermal
- Individual electric boiler
- Solar Thermal
- Solar cooling
- Others
- Natural ventilation
- Nocturnal ventilation
- Free-cooling
- Single flow
- Double flow heat exchanger
- Solar photovoltaic
- Solar Thermal
- Wood boiler
- Solar absorption chiller
- Biomass boiler
- 33,00 %
Smart Building
Urban environment
- 39 580,00 m2
- 22,00 %
Product
CTA Menerga
Central air handling units used for cooling laboratory via a system of evaporative cooling by drying
Water management
Indoor Air quality
GHG emissions
- 7,00 KgCO2/m2/an
- 50,00 année(s)