GREEN ® OFFICEÂ MEUDON
Last modified by the author on 22/03/2012 - 10:13
New Construction
- Building Type : Office building < 28m
- Construction Year : 2011
- Delivery year : 2011
- Address 1 - street : 11, Avenue Maréchal Juin 92 MEUDON, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 23 300 m2
- Construction/refurbishment cost : 100 000 000 €
- Number of Work station : 1 300 Work station
- Cost/m2 : 4291.85 €/m2
-
Primary energy need
88.56 kWhep/m2.an
(Calculation method : RT 2005 )
concept of avant-garde, signed Bouygues Immobilier. Green Office ® Meudon with an area of 23,300 sq.m. building is the first major positive energy in France. Located between the technological center of Velizy and the forest of Meudon, the building, which was designed by Ion Enescu's architects Ateliers 115, was acquired by Scor. It is the subject of the first energy performance contract private. Steria, a leading European IT services company, is headquartered FRANCE. A choice that allows the company to implement a strong civic commitment, with an optimized energy budget and to provide its 1,300 employees a wellness involving new responsibility of each. The concept, based on bias combining energy optimization, comfort and welfare of users, features many innovations without involving additional costs for users and investisseurs.Au center of the device: - a centralized system of control energy unreported; - a compensation device consumption by renewable energy production and use of passive energy principles; - an architectural bias favoring natural light, the thermal and acoustic insulation, 100% natural ventilation in summer ...
Sustainable development approach of the project owner
Green Office® Meudon Office an area of 23,300 m² SHON is the first large-scale building has positive energy in France. Between the technological pole of Velizy and the forest of Meudon, the building, which was designed by Ion Enescu's architects Ateliers 115, was acquired by SCOR.It is the subject of the first energy performance contract deprives.Steria, a leading European IT services company, is headquartered FRANCE. A choice that allows a company to set 'implement a strong civic commitment, with an optimized energy budget and offer its 1,300 employees a new wellness involving the responsibility of each.The concept, based on bias combining energy optimization, comfort and well-being of users, features many innovations without involving additional costs for users and investors.In the center of the device:-A centralized system control ENERGY inedit;-A compensation device consumption by renewable energy production and application of the principles of passive energy;-An architectural bias privileging the natural light, the thermal and acoustic insulation, 100% natural ventilation in Summer 'Architectural description
According to the principles of bioclimatic architecture, Green Office ® Meudon has been designed with a bias resolutely turned to the limitation of energy requirements, including those related to lighting.Arranged mostly in parallel, buildings benefit from a north-south orientation allowing an optimal daylighting and sunlight reduces the interior spaces.Their depth, 13.50 m was limited, allows a fitting out of offices in all the first day and therefore benefit from the natural light but also to allow thermal comfort by natural ventilation in Summer.The bay windows represent 40% of the total area of the facade to promote light transmission and solar gain.A central core, oriented east-west, the liaison of all body building. It contains health groups, service shafts, elements of vertical circulation and some offices oriented to the east.To avoid installing an energy efficient air conditioning, Bouygues Immobilier has chosen to naturally cool the offices of Green Office ®. And the facade is constantly adapting to the needs of heating and cooling of the building based on climatic periods.See more details about this project
http://www.green-office.frStakeholders
Contractor
BOUYGUES IMMOBILIER - CARTIER Alexandre
http://www.green-office.frConstruction Manager
ATELIERS 115 ARCHITECTES - ENESCU Ion
http://www.ateliers115.frThermal consultancy agency
ARCOBA - MAYAUD Damien
http://www.icade.fr/activites/promoteur-projets-immobiliers/icade-acteur-plan-conception-ingenierie-immobiliere/icade-arcoba-ingenierie-projetAssistance to the Contracting Authority
TRIBU - BORNAREL Alain
http://www.tribu-concevoirdurable.frCertification company
Certivéa
http://www.certivea.fr/Contracting method
Off-plan
Energy consumption
- 88,56 kWhep/m2.an
- 106,53 kWhep/m2.an
Real final energy consumption
62,00 kWhef/m2.an
Envelope performance
- 0,60 W.m-2.K-1
- 1,00
Systems
- Combined Heat and Power
- Other hot water system
- No cooling system
- Natural ventilation
- Nocturnal Over ventilation
- Double flow heat exchanger
- Solar photovoltaic
- Biomass boiler
- 114,00 %
Smart Building
Urban environment
Product
VELUM
BOUYGUES IMMOBILIER - ARCOBA
The VELUM is a suspended ceiling meet several criteria: sound absorption; lighting with presence detection and probe brightness, has hot water radiant heating.
BIOMASS BOILERS COGENERATION VEGETABLE OIL
COGENGREEN
http://www.cogengreen.com/Génie climatique, électricité / Chauffage, eau chaude
The boilers burn the capacity oil vegetable residues resulting from rape and produce 100% of the needs of hot and 55% of electric needs to the scale of one year.
EPC - Energy Performance Contracting
BOUYGUES IMMOBILIER - EXPRIMM
http://www.exprimm.fr/
First CPE for a commercial building with guaranteed support for the tenant.
LMO - OPENING OF MOTOR BREAKDOWN
BOUYGUES IMMOBILIER - TRIBU - ARCOBA
Gros œuvre / Système passif
LMOs involved a passive design of the building controlled by the opening of the doors.
Construction and exploitation costs
- 8 000 000,00 €
GHG emissions
- 83,50 KgCO2/m2/an