Reconstruction of a farmhouse in shops, services and housing in Forges
Last modified by the author on 24/06/2014 - 15:25
New Construction
- Building Type : Collective housing < 50m
- Construction Year : 2011
- Delivery year : 2011
- Address 1 - street : 19 route de Mirecourt 88390 LES FORGES, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 800 m2
- Construction/refurbishment cost : 2 120 000 €
- Number of Dwelling : 4 Dwelling
- Cost/m2 : 2650 €/m2
-
Primary energy need
54.7 kWhep/m2.an
(Calculation method : RT 2005 )
- Self-declaration of BBC approach
- Prebat 2009 prizewinner
The project was initially a major renovation of an old farmhouse in the Vosges region, located in the historical center of the city. But the supervising office’s refusal led to the total demolition of the building and its reconstruction in its original form.
The general design and the façade of the building have been preserved in order to fit 4 housings, an agricultural and food products’ shop and a local for nurses and veterinarians.
After demolition, the cornerstones, the vault of the carriage gateway and window frames were refited. Floor slabs and walls’ rubble stones were reused.
Sustainable development approach of the project owner
- Self-declaration of BBC approach- Prebat 2009 prizewinner
Low environnemental impact building site:
- Prefabrication of the wooden structure
- Charter of green building site, dry toilets
Business waste:
- Waste sorting, composting, shelter for waste containers
Acoustic comfort
- Sound insulation: walls: 14.7 cm cellulose + 4cm wood / Floors: rigid wood wool
- Sount attenuators (ventilation ducts)
Visual comfort
- External blinds (South + West)
- Skylights
Architectural description
The project was initially a major renovation of an old farmhouse from the Vosges in the commune centre. But the supervising office’s refusal led to the total demolition of the building and its reconstruction in its original form.The general design and the façade of the building have been preserved in order to fit 4 housings, an agricultural and food products’ shop and a local for nurses and veterinarians.
After demolition, the cornerstones, the vault of the carriage gateway and window frames were refited. Floor slabs and walls’ rubble stones were reused.
Green Spaces:
Green spaces, flowery meadow, fruit trees
Orientation: North-South-East-West (South frontage mostly glazed).
See more details about this project
http://www.lqe.fr/home/upload/fiches/FicheFermeForgeronneLesForges.pdfStakeholders
Contractor
Commune Les Forges
Designer
Vitalis Architecture
http://vitalis.architecture.pagesperso-orange.fr/Designer
Ascendense Architecture
Others
B. Kubler
http://www.kubler-paysage.fr/Other consultancy agency
Trigo
http://www.trigo.fr/Thermal consultancy agency
Permanergie
Others
Apave
http://www.apave.com/Company
FG construction
Company
Socopa
http://www.constructions-socopa.fr/Company
Ecodenn’Ergie
http://ecodenn.monsite-orange.fr/Contracting method
Separate batches
Type of market
Global performance contract
Energy consumption
- 54,70 kWhep/m2.an
- 169,00 kWhep/m2.an
Envelope performance
Systems
- Wood boiler
- Other hot water system
- No cooling system
- Double flow heat exchanger
- Wood boiler
Smart Building
Urban environment
Construction and exploitation costs
- 212 249 €
- 2 120 000 €
- 826 188 €
Water management
Indoor Air quality
GHG emissions
- 1,00 KgCO2/m2/an