Offices of the Conseil Général of the Vosges in Epinal (88)

4433
Last modified by the author on 27/08/2019 - 18:39

New Construction

  • Building Type : Office building < 28m
  • Construction Year : 2010
  • Delivery year : 2010
  • Address 1 - street : 14 rue de la Préfecture 88000 EPINAL, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 1 675 m2
  • Construction/refurbishment cost : 3 930 000 €
  • Number of Work station : 70 Work station
  • Cost/m2 : 2346.27 €/m2

Proposed by :

  • Primary energy need
    56 kWhep/m2.an
    (Calculation method : RT 2005 )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building
  • Environmental Management System
  • PREBAT 2008 prize winner
  • Nominated for the LQE (Environmental Quality in Lorraine) prize in 2009 

The Conseil Général of the Vosges department wished to create a building with exemplary environmental performance. The energy-savings have therefore oriented the project. Users comfort and convenience issues were also a crucial concern during this building operation. This office building was designed to minimize heat losses and the goal is to achieve a heating consumption below 15 kWh/sqm/year.

Sustainable development approach of the project owner

- Environmental Management System
- PREBAT 2008 prize winner
- Nominated for the LQE (Environmental Quality in Lorraine) prize in 2009

The Conseil Général of the Vosges department wished to create a building with exemplary environmental performance. The energy-savings have therefore oriented the project. Users comfort and convenience issues were also a crucial concern during this building operation. This office building was designed to minimize heat losses and the goal is to achieve a heating consumption below 15 kWh/sqm/year.

Hygrothermal comfort
- High inertia
- Airtightness and thermal bridges treatment
- Canadian well and deep geothermal
- Heating pins on vents
- Heating and refreshing floor

Visual comfort
- Automatic lighting and presence detectors
- Fixed sun-breaker

Low environmental impact building site:
- "Low impact building site" charter
- Re-use of materials by crushing on site
- Site-school
- Information to local residents
- Site visits for users

Architectural description

This operation houses the HR department as well as services related to the life of the COnseil Général. It is made of two buildings connected by a gallery. The building on the street has four floors above ground floor, the building on the garden has two floors above ground floor.

East / West Orientation

See more details about this project

 http://www.lqe.fr/home/upload/fiches/FicheCG88.pdf

Stakeholders


    Designer

    Lucien Colin et Dominique Henriet


    Other consultancy agency

    BECSI EIC








Contracting method

Separate batches

Type of market

Global performance contract

Energy consumption

  • 56,00 kWhep/m2.an
  • 100,00 kWhep/m2.an
  • RT 2005

Envelope performance

    Material
    - Façade: Concrete on the street and wood on the garden.
    - Floors and walls: stone, linoleum, solvent-free paints.

    Insulation:
    - Roof: 30 cm of mineral wool.
    - Walls: 40 cm of mineral wool from the outside.
    - Low-floor: EPS

    Glazing: Double glazing (unspecified performance).

Systems

    • Condensing gas boiler
    • Low temperature floor heating
    • No domestic hot water system
    • Reversible heat pump
    • Floor cooling
    • Canadian well
    • Double flow heat exchanger
    • Canadian well
    • Other, specify

    Care and maintenance:
    - Preventive maintenance (heating and ventilation) facilitated by BMS
    - Use of a management software / computer-aided maintenance is under consideration

Smart Building

    Heating and ventilation are controlled by a BMS that tracks the internal weather conditions

Urban environment

  • 1 675,00 m2
  • - Located downtown, in an area included in the Risk Prevention plan of the city (PPRI) and inside the Buildings of France perimeter (historical monuments)
    - Close to public transportation
    - Integration of wood in urban environment

Construction and exploitation costs

  • 385 000
  • 3 930 000
  • 104 000

Water management

    - Green roofs with storage box
    - Rainwater harvesting for watering
    - Permeability of circulation spaces

Indoor Air quality

    - Double flow CMV
    - Natural ventilation flap in offices
    - Fresh air intake from the garden

Life Cycle Analysis

    Wood; mineral wool; stone

PDF

Share :
Author of the page

Marie-Laure Aubriot

Chargée de mission construction durable


Other case studies

More

Contest