Izuba Energies Building

12972
Last modified by the author on 09/06/2016 - 10:15

New Construction

  • Building Type : Office building < 28m
  • Construction Year : 2015
  • Delivery year : 2015
  • Address 1 - street : 34690 FABRèGUES, France
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.

  • Net Floor Area : 453 m2
  • Construction/refurbishment cost : 934 000 €
  • Number of Work station : 18 Work station
  • Cost/m2 : 2061.81 €/m2
  • Primary energy need
    20.4 kWhep/m2.an
    (Calculation method : RT 2012 )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

Specialized in energy and environmental optimization of buildings, Izuba Energies develops and disseminates tools for the energy transition (studies, software, training). To cope with the development of its business, the company decided to build its headquarters and offices near Montpellier, on Ecoparc Fabrègues. This building reflects what IZUBA Energies supported since its creation in 2001: a "negawatt" energy approach with its 3 components (simplicity, efficiency and renewable energy), coupled with a comprehensive approach integrating hygrothermal comfort, gray energy components, user behavior, waste management, indoor air quality, the transport of employees... the realization of the Izuba Energies building embodies an exemplary achievement of its business plan and its expertise.

Sustainable development approach of the project owner

The goal was to build a positive energy building, using local bio-based materials, to reduce environmental impacts.

Architectural description

The architectural design, voluntarily sober, was based on bioclimatic principles: the building must adapt better to the Mediterranean climate to ensure occupant comfort.
In winter heating requirements are reduced to a minimum:
• The building has a simple shape and a good compactness, to limit loss surfaces.
• The main facade south favors solar gain in offices, the majority on this orientation. Storage facilities and service are positioned buffer space to the north.
• The choice of timber frame insulated with straw provides a very high level of insulation of the walls.

In summer, the envelope limit overheating by adopting the following principles:
• The building is equipped with fixed and mobile solar protection blocking direct sunlight while allowing solar gain in winter.
• The thermal inertia, rather light wood frame is reinforced by interior partitions earth-straw and mud brick.
• A natural night ventilation is made possible by the opening of swinging woodwork on two opposite sides of the building and glass transoms facing traffic. Circulations are lighted and ventilated by office doors and exterior doors at the end of the corridor, all glass and equipped with overhead transoms.

Building users opinion

The occupant satisfaction is generally very positive. The premises are considered light, with a healthy and warm atmosphere due to the presence of wood and earth. Thermal comfort is sometimes difficult to adjust to the individual sensitivity of the occupants (heating / cooling floor).

If you had to do it again?

The vast majority of products and systems implemented were satisfactory. The exception is the anhydrite screed left rough after sanding and applying a hard protective oil. Due to problems of tasks and premature wear corrective action is being studied to make the hard, impervious surface, while respecting the objective of air quality inside.

See more details about this project

 http://batiment.izuba.fr

Stakeholders



Contracting method

Separate batches

Type of market

Global performance contract

Energy consumption

  • 20,40 kWhep/m2.an
  • 135,00 kWhep/m2.an
  • RT 2012

    Estimated energy balance before delivery:
    - Heating: 2.0 kWhEF / m² / year
    - Cooling: 0.8 kWhEF / m² / an
    - Hot Water: 0.5 kWhEF / m² / year
    - Ventilation: 4.6 kWhEF / m² / year
    - Auxiliary: 0.5 kWhEF / m² / year
    - Lighting: 2.7 kWhEF / m² / year
    - Specific Electricity: 9.3 kWhEF / m² / year

Real final energy consumption

    28,00 kWhef/m2.an

    705,00 kWhef/m2.an

    2 015

Envelope performance

  • 0,38 W.m-2.K-1
  • -Timber frame insulation straw
    - Exterior wall: Up = 0.17 W / m²K. wood box / straw insulation 37cm of straw, earth plaster / straw (inside and outside)
    - Roof: Up = 0.15 W / m²K. wood box / straw, straw insulation 37cm low
    - Floor: Up = 0.16 W / m²K. concrete slab-on-grade, 11 cm extruded polystyrene
    - Joinery: Up = 1.5 W / m²K. joinery wood double glazing 4/16/4 low emissivity argon
    - Thermal bridge: Psi means building: 0.14 W / (m²SRT.K)

  • 0,64
  • n50

  • 0,80

Systems

    • Geothermal heat pump
    • Low temperature floor heating
    • Fan coil
    • Solar thermal
    • Solar Thermal
    • Geothermal heat pump
    • Fan coil
    • Floor cooling
    • Natural ventilation
    • Double flow heat exchanger
    • Solar photovoltaic
    • Solar Thermal
    • Heat Pump on geothermal probes
  • 317,00 %
  • Heating / cooling production: Heat pump Weishaupt WWP S 10 IBER
    - Heat: 9.5 kW, COP 4.2
    - Cold: 14.6 kW, EER 9.1
    Transmitters: floor heating / cooling and fan convectors training room
    ventilation dual flow ventilation Swegon Gold RX TOP maximum flow 1200 m3 / h
    efficiency wheel exchanger: 81%
    air tightness of the duct system: class C
    ECS electro-solar water heater 200 liters,
    1 solar thermal collector 2 m²

    Lighting
    Offices, training rooms and meeting: tubes T5 - 6 to 14 W / m²
    Circulations and health: LED - 3-8 W / m²
    Storage, server room: compact fluorescent lamps - 13 W / m²

    photovoltaic production Total Power: 28.8 kWp - 88 modules Sunpower E20-327-COM average yield of 20.4%

    Orientation principale au sud pour bénéficier des apports solaires.

Smart Building

    Trend 963 Supervisor - Measurement of consumption and energy production in the post in 10 minutes of time - Visualization and control the heating, cooling and ventilation

    The GTC system displays the operating states and control of HVAC installation. The interface is user-friendly and publicly accessible to thermic engineer of Izuba Energy team.

Urban environment

  • 1 036,00 m2
  • 26,00 %
  • The building is located within the Eco-Park Fabrègues, area still under construction, at the interface between a residential area and a rural area. A future extension of tram line allow the direct connection of the area from the center of Montpellier.

Product

    Timber frame insulation straw

    Sud-Est Charpente

    Route de Bonlieu 26 450 CLEON D'ANDRAN - 0475901534

     http://www.sudestcharpentes.com/

    Structural work / Carpentry, cover, titghtness

    Leaning on the concrete slab of the ground floor, the building's wooden structure consists of bearing walls and internal devices on both sides of the road. These walls support the intermediate floor and roof. The bracing is provided by domestic OSB. The design has from the outset the choice of prefabrication of the timber frame as pedestals for the walls and roof.

    Prefabrication workshop, conducted with manufacturing tools desktop, ensures improved ergonomics of work, greater precision in the cuts and assemblies as well as better treatment of airtightness .


    earth plasters

    Jolie Terre

    Impasse des chênes – 30360 Martignargues - 0675529658

     http://www.jolieterre.fr/

    Finishing work / paints, mural, wallcoverings

    The company Jolie Terre implemented on our building a mix of design, made of earth extracted from a quarry near Uzes, a hundred kilometers from the site.
    Its composition: sand, clay and plant fibers (mostly straw) was designed to meet the needs of sustainable protection of straw and implementation ease. Hygrothermal characteristics of the mixture make it an excellent ally of building straw
    - indoors, it brings the inertia that could default do otherwise
    - outdoor, good permeability to the diffusion of water vapor facilitates breathing wall and prevents condensation in the straw bale

    The process used is the projection that makes the efficient implementation time and labor. A total of 36 tons of this mixture have been disposed on the building. As the external and domestic final report is quite satisfactory for the occupants.

Construction and exploitation costs

  • 1 106 000
  • 172 000

Indoor Air quality

    The hygroscopic and thermal qualities of wood and earth that is found in large quantities in local help to create a warm environment. The choice of natural materials, combined coatings with very low emissions, are the guarantee of perfect health air quality. Painting of walls and ceilings: Luc'O Satin, 0% VOC, Eco Flower Painting on wood: Biorox, VOC <5%, classification A + pipes on paint Tol Prim, Tol hydro shiny metals, classification A +

Comfort

    Simulation thermique dynamique sous Pleiades+Comfie. Objectif de limitation des durées d'inconfort à 40 heures occupées au delà de 28°C.

GHG emissions

  • 31,50 KgCO2/m2/an
  • novaEquer ACV basis Ecoinvent 2010. Scope of study: building energy consumption (réglmentaires and non-regulatory), water consumption, waste production, transport occupants. PV production is not removed.

  • 26,00 KgCO2 /m2
  • 50,00 année(s)
  • 1 775,00 KgCO2 /m2
  • ACV novaEquer, 2010. See Ecoinvent base study area below (ACV)

Life Cycle Analysis

    190

  • 950 066,00 kWhEP
  • To limit the environmental impact of the manufacture of building materials and processing end of life, the design has largely favored bio-sourced materials, minimally processed and recyclable:
    - Wooden frame insulated straw bale
    - earth plasters , clay walls and straw wall in mud brick
    - wood for exterior and interior joinery and furniture
    - anhydrite screed sanded and oiled finished floor

Reasons for participating in the competition(s)

​Le bâtiment Izuba a été conçu selon une approche transversale intégrant la performance énergétique, le confort et la performance environnementale, qui permettrait de concourir dans les catégories "Energie et climats tempérés" et "Bas Carbone".
Nous choisissons la catégorie Bas Carbone pour mettre en avant les solutions constructives retenues : l'ossature bois, l'isolation paille et les enduits terre. Ces solutions ont permis de répondre avec pertinence à l'ensemble des exigences de conception du projet.

Building candidate in the category

Low Carbon

Low Carbon

Users' Choice Award

Users' Choice Award

Green Building Solutions Awards 2016
PDF

Share :
Author of the page

Stéphane Thiers

Ingénieur R&D


Other case studies

More

Contest

Green Building Solutions Awards 2016